Monthly Archives: June 2011

PT Eleven Nesting construction: Aft flotation1

Following are pictures of the aft bouyancy tanks coming together. A blind fillet is made while you have access to the inside area of the tank. Glue on the tank sides: Glue applied on the blind fillet and glue cleats: … Continue reading

Posted in ALL, Nesting Dinghy, Nesting-PT11 Construction | Leave a comment

PT Skiff slotted floor grates kit

Slotted floor grates for the PT Skiff are attractive and an easier and more economic solution for the aft soles compared to the lumber floor grates kit originally offered. The photo shows an unfinished kit.

Posted in ALL, kit options, PT Skiff Construction, PT Skiff Updates | Leave a comment

PT ELEVEN foils

Foil kit for the PT Eleven (shown finished)  These are prototypes of the foils we will be offering in kit form. The foil shape (naca 0012) is NC machined from Okoume plywood in 2 halves. We bond the 2 halves … Continue reading

Posted in ALL, Hardware, kit options, Nesting Dinghy, Nesting-PT11 Construction | Leave a comment

PT Eleven Chine taping

Some photos of taping the chines…I am a little behind on posting…Sorry about that. Russell has been working on some details and then had to take off for a week.. I will post more soon. The boat is looking beautiful … Continue reading

Posted in ALL, Nesting Dinghy, Nesting-PT11 Construction | Leave a comment

PT Skiff PIKA in Lake Chelan

The owner/builder of the PT Skiff PIKA, recently sent this note with pictures. PIKA runs with an E-Tec 25hp motor. …. Hey Guys, We had a great trip up Lake Chelan and the boat performed beautifully!  Fully loaded with 3 … Continue reading

Posted in ALL, PT Skiff Activities, PT Skiff Updates | Leave a comment

PT Eleven; back seat/buyoncy

Pre glassing the back seat/ buoyancy tank parts

Posted in ALL, Nesting Dinghy, Nesting-PT11 Construction | Leave a comment

PT Eleven filleting 2

Filleting gussets….

Posted in ALL, Nesting Dinghy, Nesting-PT11 Construction | Leave a comment