Port Townsend Watercraft BLOG

June 6, 2011

PT Eleven; back seat/buyoncy

Filed under: ALL,Nesting Dinghy,Nesting-PT11 Construction — admin @ 12:27 am

Pre glassing the back seat/ buoyancy tank partsptwatercraft.com

ptwatercraft.com

midsection of the back seat bulkhead cut away.

ptwatercraft.com

Buoyancy tanks dry fit... tongues and slots sure are great.

June 3, 2011

PT Eleven filleting 2

Filed under: ALL,Nesting Dinghy,Nesting-PT11 Construction — admin @ 3:06 pm

Filleting gussets….

ptwatercraft.com

Priming

ptwatercraft.com

the bead of fillet mix

ptwatercraft.com

shaped fillet

May 29, 2011

PT Eleven making progress

Filed under: ALL,Nesting Dinghy,Nesting-PT11 Construction — admin @ 11:45 pm

PT Eleven in progress;
main bulkheads in place,
daggerboard trunk in place,
mast partners in place,
gussets glued in and all of the above ready for filleting.ptwatercraft.comptwatercraft.com

May 27, 2011

PT ELEVEN main bulkheads1

Filed under: ALL,Nesting Dinghy,Nesting-PT11 Construction — admin @ 11:44 pm

ptwatercraft.comAligning main bulkheads with spacers between.ptwatercraft.comMain bulkheads glued in.ptwatercraft.com

main bulkheads filleted

May 24, 2011

Fillet stick set

Fillet stick set now available. Arrives as 4 sticks connected. You separate them and bevel edges to end up with 8 sizes ranging from 1/2inch to 2 inches. ptwatercraft.com

ptwatercraft.com

Fillet sticks ready for use

$10 + postage.  See our site for details.  We are including a chisel stick in our set since it is essential for clean filleting!

ptwatercraft.com

Using a chisel stick to clean up fillets

May 22, 2011

PT Eleven – filleting

Filed under: Nesting Dinghy,Nesting-PT11 Construction — admin @ 2:18 pm

Hull ready for filleting. ptwatercraft.com

PT Eleven constuction blog 8

Filleting the inside of the hull. ptwatercraft.comptwatercraft.com

May 19, 2011

PT Eleven construction 7

Filed under: ALL,Nesting Dinghy,Nesting-PT11 Construction — admin @ 11:10 am

After installing the inner stem, which is a machined part, the panel ends are removed.ptwatercraft.com

Shaping the stem…

May 13, 2011

PT Eleven construction 6

Filed under: ALL,Nesting Dinghy,Nesting-PT11 Construction — admin @ 3:25 pm

We are actually a bit further than these pictures represent. We have had some kit related stumbling blocks along the way and Russell is working those through. Today’s photo shows the upper layer of transom inwhale ready for glue. http://www.ptwatercraft.com

May 10, 2011

PT Eleven construction 5

Filed under: ALL,Nesting Dinghy,Nesting-PT11 Construction — admin @ 11:57 pm

Gluing the hull seams: http://www.ptwatercraft.comIce cream delivery!

May 9, 2011

PT Eleven construction4

Filed under: ALL,Nesting Dinghy,Nesting-PT11 Construction — admin @ 1:05 pm

Gluing on the gunwhale.. http://www.ptwatercraft.comGunwhale glued on: http://www.ptwatercraft.com

« Newer PostsOlder Posts »

Powered by WordPress